House 1 on the street Chernivetska, 5 — put into operation in 3 sq. 2012, building 2 str. Chernivtsi, 5v — put into operation in 3 sq. 2013, building 3 Shevchenkivskyi lane, 30A — entered in 3 sq. 2014, building 4, Shevchenkivskyi, 30 — introduced in 2016, building 5, str. Chernivtsi, 3b — put into operation in 3 sq. 2016, 6 Shevchenkivskyi building, 32) — put into operation in 4 sq. 2016. The seventh building was introduced in 2017 and the last, the eighth - in 2021